These figures belong to the named source and method. Historical costs are not current quotations. A value without its stage, material basis or measurement location is not a farm instruction.
| What is measured | Value and basis | Source and limitation |
|---|---|---|
| Pre-wetting duration | 24-48 hours | ICAR-DMR manual, 2011. on a platform, leachate recycled |
| Moisture after pre-wetting | 75 % | ICAR-DMR manual, 2011. target to reach before stacking |

