These figures belong to the named source and method. Historical costs are not current quotations. A value without its stage, material basis or measurement location is not a farm instruction.
| What is measured | Value and basis | Source and limitation |
|---|---|---|
| Fill loading to record | 900 to 1,000 kg per square metre | ICAR-DMR manual, 2011. At a fill height of 2 to 2.2 metres |
| Levelling off temperature | 45 to 48 °C | ICAR-DMR manual, 2011. Log the hour it was reached after filling |

