Record: The probe map, each monthly calibration check, and the coldest zone per batch.
Sketch the tunnel from above and mark door end, far end, floor zones.
Number every probe on the sketch and paint it on the cable.
Note the depth each probe sits at below the compost surface.
Run one batch and mark the zone that stayed coldest throughout.

