Record: Batch number, hold hours, every reading with its point, and why you ended the hold.
Write down tunnel size and expected batch output in tonnes before filling.
Log compost temperature at three depths, three times a day, through the hold.
Test ammonia at three fixed points with a declared safe method, not by smell.
Mark each hour the mass leaves the 45 to 48 °C band and what you changed.

