These figures belong to the named source and method. Historical costs are not current quotations. A value without its stage, material basis or measurement location is not a farm instruction.
| What is measured | Value and basis | Source and limitation |
|---|---|---|
| Long method duration | 28-30 days | ICAR-DMR manual, 2011. with 7 to 8 turnings |
| Phase I in a bunker | 6-8 days | ICAR-DMR manual, 2011. against 10 to 12 days outdoors |

