Phase II is four jobs done in one room, in one order, with the door shut. Getting the order wrong costs the whole batch.
- By the end you can list the four stages with their temperature and time.
- By the end you can explain why heating and cooling rates are controlled.
- By the end you can state what must be true before compost leaves the tunnel.

