- Certifying a batch from one probe when the tunnel is metres long.
- Overfilling or filling unevenly, which sends air around the heavy zones instead of through them.
- Choosing a fan by motor power, with no airflow figure at the pressure a loaded tunnel creates.
Tunnel Operation
Pause and recall
