These figures belong to the named source and method. Historical costs are not current quotations. A value without its stage, material basis or measurement location is not a farm instruction.
| What is measured | Value and basis | Source and limitation |
|---|---|---|
| Pre-wetting | 24-48 hours | ICAR-DMR manual, 2011. To about 75 percent moisture. |
| Heap width, plains and hills | 100-120; 130-150 cm | ICAR-DMR manual, 2011. Never under 300 kg. |

