These figures belong to the named source and method. Historical costs are not current quotations. A value without its stage, material basis or measurement location is not a farm instruction.
| What is measured | Value and basis | Source and limitation |
|---|---|---|
| NHB project components | 6 components | NHB DPR model, 2018. Subsidy availed only once in the scheme. |

