These figures belong to the named source and method. Historical costs are not current quotations. A value without its stage, material basis or measurement location is not a farm instruction.
| What is measured | Value and basis | Source and limitation |
|---|---|---|
| Private sector assistance | 40 % of cost | MIDH guidelines, 2025. 50% in NE and Himalayan states, Scheduled areas, vibrant villages and island territories. |
| SLEC ceiling for mushroom projects | 20 Rs lakh project cost | MIDH guidelines, 2025. Decides which committee sanctions. |

