These figures belong to the named source and method. Historical costs are not current quotations. A value without its stage, material basis or measurement location is not a farm instruction.
| What is measured | Value and basis | Source and limitation |
|---|---|---|
| MIDH low cost unit norm | 2 Rs lakh for 200 sq ft | MIDH guidelines, 2025. 50% assistance, up to five units per beneficiary, as the guideline states. |
| SLEC ceiling for mushroom projects | 20 Rs lakh total project cost | MIDH guidelines, 2025. Above this a different committee reads the file. |

