| Supplier statement | Ask for | Acceptance evidence |
|---|---|---|
| Cooling is sufficient | Load basis and design conditions | Commissioning readings under the agreed conditions |
| Air reaches every bed | Distribution layout and test method | Measurements at representative loaded-room locations |
| Fully automatic | Control sequence, alarms and manual fallback | Witnessed alarm and recovery demonstrations |
| Turnkey | Explicit inclusions, exclusions and responsibility matrix | Signed handover list with unresolved items visible |
In the field
Compare the evidence
