Record: Room area, fill weight, yield basis and source, cycles planned, kg per year, binding constraint.
Measure the usable bed or rack area of one planned room.
Write each link of the chain on one line with its source beside it.
Mark every link without a published source as an assumption.
Ask which link fails first if compost is late, and call it your binding constraint.