NHB mushroom DPR model (2018): Historical project-report structure, not current eligibility, prices or sanction. Worked examples below are original and hypothetical.
ICAR-DMR farm design bulletin: Farm-system background. The procurement worksheet and illustrative scheduling arithmetic are editorial tools, not an engineered design.

