Quick orientation
Inspect the floor, drain and probes before filling. Record depth and pressure response after loading.
01
Simple explanation
A bunker is a loaded porous bed served by a floor and blower, not an empty concrete box.
02
What is happening
Compost density and moisture change resistance, while microbial activity changes heat and oxygen demand.
03
Operator explanation
Inspect the floor, drain and probes before filling. Record depth and pressure response after loading.
04
What to observe
Observation should describe stage, location, pattern and change history before interpretation.
- Wall and floor condition
- blocked outlets
- load geometry
- pressure imbalance
- leachate
- safe access
05
What to measure
Measurement must retain method, unit, location, timing, calibration and sample identity.
- Usable dimensions
- fill depth
- contextual density
- pressure
- verified airflow
- temperature map
06
Equipment and process boundary
Equipment is useful only when its role in the biological process is explicit.
- Bunker walls
- open loading face
- floor system
- blower
- air main
- drain
- probes
07
Variables that interact
Civil structure, loader access, air main, floor outlets, blower, drainage, sensors and controls must be coordinated.
08
What can go wrong
A symptom may have several mechanisms. Verify the cause before changing the process.
- Volume called mass without density
- HP-based capacity claim
- poor drainage
- no cleaning access
- floor damage
09
What changes at commercial scale
Scaling changes geometry, repeatability, instrumentation, material flow and failure consequence.
- Gross volume is geometry only
- Commercial capacity must include batch schedule, density, process duration and downstream tunnel bottlenecks
10
Evidence boundary
Mapped evidence: Farm Design for White Button Mushroom Cultivation; Technologies Developed by ICAR-DMR for Commercial Use; Straightening Out Fan Curves. Foundational, current operational, research and engineering sources retain their different roles.
Bunker capacity model
Geometry first. Mass appears only when you provide a contextual bulk density.
Formula, assumptions and limits
V = L × W × DM = V × ρThe rectangular model does not infer freeboard, voids, real filling uniformity, structural capacity or airflow duty.
Technical diagrams
Original system diagrams separate air paths, material paths, measurements and biological transformations.
Progressive depth
Move from field observation to mechanism, engineering and evidence without losing the original question.
PracticalWhat the operator notices
- A bunker is a loaded porous bed served by a floor and blower, not an empty concrete box.
- Wall and floor condition
- blocked outlets
- load geometry
TechnicalHow process variables interact
- Civil structure, loader access, air main, floor outlets, blower, drainage, sensors and controls must be coordinated.
- Usable dimensions
- fill depth
- contextual density
EngineeringHow the physical system serves the process
- Bunker walls
- open loading face
- floor system
- Gross volume is geometry only
- Commercial capacity must include batch schedule, density, process duration and downstream tunnel bottlenecks
ResearchWhich evidence records govern this page
- COMPOST-SRC-DMR-FARM-DESIGN
- COMPOST-SRC-DMR-TECHNOLOGIES
- COMPOST-SRC-AMCA-FAN-CURVES
The numbers for this step, with their source.
Process values are published from ICAR-DMR guidance with the stage and measuring point they apply to. A parameter still marked pending has no published Indian value yet.
Biological and process parameters
COMPOST.PHYSICS.BULK_DENSITYpending technical verificationContextual bulk density
Technical value pending verification- Stage
- Loading and capacity planning
- Measurement context
- Representative material at stated compaction and moisture
- Conditions
- Process stage; moisture; compaction; particle structure
COMPOST.PHYSICS.FILL_DEPTHsource contextualBulk tunnel fill height
2 to 2.2 m- Stage
- Bunker or tunnel filling
- Measurement context
- Mapped depth across the loaded floor
- Conditions
- ICAR-DMR bulk tunnel: fill height 2 to 2.2 m; About 900 to 1,000 kg compost per square metre of floor; Loading uniformity and density change the effective depth
Engineering design metrics
COMPOST.BUNKER.USABLE_LENGTHpending technical verificationUsable length
Project value pending verification- Component
- Phase I bunker
- Design context
- Internal loaded dimension
- Method
- Project-specific engineering calculation required
COMPOST.BUNKER.USABLE_WIDTHpending technical verificationUsable width
Project value pending verification- Component
- Phase I bunker
- Design context
- Internal loaded dimension
- Method
- Project-specific engineering calculation required
COMPOST.BUNKER.FILL_DEPTHpending technical verificationFilling depth
Project value pending verification- Component
- Phase I bunker
- Design context
- Loaded compost geometry
- Method
- Project-specific engineering calculation required
COMPOST.AERATION.STATIC_PRESSUREpending technical verificationRequired static pressure
Project value pending verification- Component
- Aeration system
- Design context
- Complete floor, duct and compost system
- Method
- Project-specific engineering calculation required
Auditable calculation framework
Every equation exposes inputs, units, assumptions, output and validation rules.
COMPOST.FORMULA.BUNKER_VOLUMECalculate gross loaded compost volume from user-provided usable dimensions.
V = L × W × D- L: Usable length
- m. positive user input
- W: Usable width
- m. positive user input
- D: Filling depth
- m. positive user input
Assumptions and validation
Assumptions
- Rectangular usable volume
- dimensions use the same unit
- voids and freeboard are excluded only if the user excludes them
Validation tests
- Reject zero or negative dimensions
- verify cubic-metre dimensional output
COMPOST.FORMULA.INDICATIVE_MASSConvert gross volume to indicative mass using contextual user-provided bulk density.
M = V × ρ- V: Gross compost volume
- m³. calculated or user input
- ρ: Contextual bulk density
- kg/m³. verified or user-provided input; no default
Assumptions and validation
Assumptions
- Density represents the same process stage, moisture and compaction as the volume
Validation tests
- Do not calculate mass without density
- reject nonpositive density
- verify kilogram output
Bunker Inspection
Record actual observations and measured values. No unsourced setpoint is prefilled.
Evidence, applicability and review3 mapped sources
Sources support mechanisms and architecture. Technical and engineering values publish only through their separate governed registries.
Farm Design for White Button Mushroom Cultivation
Indian farm workflow, compost-unit components, tunnel and controlled-farm engineering vocabulary.
- Publisher
- ICAR-Directorate of Mushroom Research
- Accessed
- 2026-08-22
Technologies Developed by ICAR-DMR for Commercial Use
Documents distinct Indian composting methods, including aerated indoor Phase I and ZEPT concepts.
- Publisher
- ICAR-Directorate of Mushroom Research
- Accessed
- 2026-08-22
Straightening Out Fan Curves
Fan curve, system curve, airflow, static pressure, operating point and efficiency concepts.
- Publisher
- Air Movement and Control Association International
- Accessed
- 2026-08-22