पाठ 18 / 18 · Compost Operator

बैच रिकॉर्ड

हर बैच का नंबर, वास्तविक सामग्री और वजन, प्रक्रिया की अवस्थाएँ, विचलन, लिए गए निर्णय और उनका परिणाम लिखें, और वही नंबर फसल के रिकॉर्ड तक ले जाएँ।

  • By the end you can list what belongs in a compost batch record.
  • By the end you can write an entry that someone else can act on.
  • By the end you can carry a batch number forward into the crop.

The record follows the batch from raw lots to the cropping room.

  1. IdentifyGive the batch a number before mixing starts.
  2. Log inputsRecord lots, weights and every substitution.
  3. Log processNote states, deviations, actions and results.
  4. Hand overCarry the number into the cropping record.

ये आंकड़े संबंधित स्रोत और विधि के संदर्भ में हैं। इन्हें हर प्रजाति या फार्म का सार्वभौमिक निर्देश न मानें। पुराने मूल्य वर्तमान बाज़ार भाव नहीं हैं।

Fill loading to record900 to 1,000kg per square metreAt a fill height of 2 to 2.2 metresस्रोत: ICAR-DMR manual, 2011
Levelling off temperature45 to 48°CLog the hour it was reached after fillingस्रोत: ICAR-DMR manual, 2011
Peak hold58 to 59°CRecord start and end hours of the 4 to 6 hour holdस्रोत: ICAR-DMR manual, 2011
Conditioning hold3 to 4daysBulk tunnel; log the ammonia evidence that ended itस्रोत: ICAR-DMR manual, 2011
Compost per tonne of straw1.75 to 3.5tonnesLong 1.75 to 2.0, short 2.0 to 2.5, indoor 3.0 to 3.5स्रोत: ICAR-DMR manual, 2011
Illustration of an operator recording a compost probe reading beside material samples.
AI-generated teaching illustration · not field evidence
Connect the picture to the lesson

Release with evidence

Notice
The batch record brings measurements and observations together.
Understand
The calendar alone cannot prove compost is ready for spawning.
Try it
Hold unresolved batches for a competent release assessment.
See where this fits in the full workflow →

01What a batch record holds

A batch record is not a temperature chart. It holds five things: the identity of the batch, the inputs that went into it, the process it passed through, every deviation from plan, and the decisions people took.

Each entry carries the same fields, and the last two are the ones farms skip. Stage. Measurement, with its point. Equipment state, meaning what the fan and dampers were doing. The deviation. The action. The reason for it. And the result, written later when you went back and looked. A record with actions but no results teaches nobody anything.

02Start with what you actually used

Write down the lots, not the recipe. Which straw, from which supplier, how many bales and how old. Which manure, from where, arriving when. The weights you actually put on the heap, including the substitution you made when the cotton seed cake did not arrive.

Mass tells the truth later. DMR reports that a tonne of straw yields about 1.75 to 2.0 tonnes of long method compost, 2.0 to 2.5 by short method and 3.0 to 3.5 by indoor bunker. If your ratio drifts far from the method you ran, either the water or the record is wrong.

03The process states worth logging

Log the states a decision hangs on rather than everything a controller can print. The fill, in tonnes and kilograms per square metre, since DMR works to 900 to 1,000 kg. The levelling off at 45 to 48 °C. The peak at 58 to 59 °C and the hours held there. The conditioning hold, the days it ran, and the ammonia evidence that ended it.

Beside each, write the fan and damper state and the initials of the person on shift. Two identical curves with different people and weather are not the same batch.

  • Fill
  • Levelling
  • Peak
  • Conditioning
  • Release

04Carry the number forward

The batch number should not die at spawning. It belongs on the room sheet, the spawn lot and the yield record, because that is the only way a third flush problem traces back to a formulation change six weeks earlier.

Paper is fine for a small unit if it is complete and legible and kept where the next shift can read it. What matters is that the record was written while the work happened. A record filled in from memory on Sunday evening is a story, and stories cannot be investigated.

Rebuild your batch sheet

  1. Print one sheet per batch with a number at the top.
  2. Add rows for lots and weights actually used, not the standard recipe.
  3. Add a deviation column beside every process row.
  4. Write the result of each action a day later, in the same row.

डायरी में लिखें: Batch number, input lots and weights, process states with times, deviations, actions with reasons, results.

ये गलतियां न करें

  • Recording the recipe instead of the weights and substitutions actually used.
  • Filling the sheet from memory at the end of the week, when the detail has gone.
  • Ending the record at spawning, so no crop problem traces back to the compost.

खुद को जांचें

तीन सवाल, तुरंत जवाब
  1. The field most often missing from a farm record is:

  2. DMR reports that one tonne of straw yields, by long method:

  3. A batch number should be carried:

यह संपादकीय स्व-जांच है, प्रमाणपत्र नहीं। जवाब इस डिवाइस पर भी सहेजे नहीं जाते।

शब्दावली

Deviation
Any point where the batch did not follow the plan.
Batch identity
The number that ties inputs, process, release and crop together.
Mass balance
Comparing compost produced against straw used, as a check.
संदर्भ और आगे पढ़ें
Button mushroom compost knowledge system

A lesson cannot replace batch measurements or plant-specific procedures.